Tom Randall Distributing – Layton, Utah

Tom Randall Distributing – Layton, Utah

Project Type: Commercial / Industrial
Location: 415 Sugar Street, Layton, Utah 84041
Completion Date: May 2017
Duration: 12 Months
Size: 30,000 sq ft
Cost: $4,000,000

Overview

Center Point built a new distribution facility for Tom Randall Distributing to streamline oil transport and inventory control. The block structure with steel roofing integrates fueling and loading operations with a clean, efficient warehouse and office core. The site and building systems were sequenced to support daily logistics and safe traffic flow.

Project Highlights

  • Integrated loading and fueling stations for transport fleet
  • Warehouse with optimized storage and inventory containment
  • Office suites for operations and administration
  • Six of Utah’s largest underground storage tanks
  • Durable block structure with steel roofing

Client Impact / Result

The facility consolidates critical operations, reducing handling time and supporting future growth.